A recent government inspection details improvements that they want to see in the school's infrastructure.
This photo is of the inspectors with a group of staff and children. Some of their recomendations need to be addressed urgently. Money is tight but with your help we will work hard to complete the list.
1. Girls Toilet should be constructed close to their dormitory.
2. The floor of the dormitories to be fixed, both boys’ and girls’ dormitories.
3. Stalled bathroom and toilets to be completed; bathroom to be constructed for boys.
4. Laboratory floor to be fixed: Leaking gas taps and water supply system to be repaired.
5. Broken or missing window panes in the school buildings to be replaced
6. Hand washing points to be fitted with running water and soap in the Kitchen and toilets.
7. Cooks to wear uniforms including gumboots and apron in line with health standards.
8. A library to be constructed and equipped with the necessary learning materials for CBE.
9. Security lighting should be installed all round to light up the entire school compound.
10. The school building exterior to be painted including rusting doors and windows.










